Public Works is responsible for the maintenance of approximately 325 km of Township roads.  Please note that the Region of Durham is responsible for all regional roads (Regional Roads 1,8,11,13,21,23,30 & 39).

Road maintenance includes snow plowing, sanding, snow removal, grading, patching, ditching, potholes, sidewalks, culverts, boulevard tree trimming, rural roadside grass cutting, streetlights, traffic and street signs, roadside garbage, street sweeping, storm sewers and the construction of roads infrastructure.

Public Works is also responsible for school crossing guards.

Street Light Maintenance

To report a malfunctioning street light, please contact Jo Ann Merrick at 905-852-9181 ext. 202

NEWS

Second Addendum to the Municipal Class Environmental Assessment

Addendum to the Municipal Class Environmental Assessment - November 2016

Uxbridge Downtown Flood Reduction - Class Environmental Assessment - Addendum to the Environmental Study Report -
Public Information Session - July 5th, 2016

Uxbridge Downtown Flood Reduction - Comment Sheet

Uxbridge Downtown Flood Reduction - Public Information Centre - July 5th, 2016

NOTICE OF ADDENDUM - UXBRIDGE DOWNTOWN FLOOD REDUCTION - MUNICIPAL CLASS EA 
 
Click here to see the Notice
 
Click here to see the full Addendum
 
The original Downtown Flood Reduction Environmental Study Report and Appendices can be found below;
 
 
Stantec Stormwater Management Pond Assessment

Stantec Consulting Limited conducted an assmessment of Twenty Two (22) Stormwater Management (SWM) Facilities within the Township of Uxbridge in 2012 to assist the Township in prioritizing maintenance activities.  Below is a link to the full document.

Stormwater Management Master Plan - Uxbridge Urban Area and Hamlet of Coppin's Corners, Township of Uxbridge - Final

Stormwater Management Pond Presentation

Notice of Study Completion - Stormwater Management Master Plan - Uxbridge Urban Area and Hamlet of Coppin's Corners, Township of Uxbridge - Notice

STAFF

Director of Public Works: Ben Kester C.E.T., CRS-S
Township of Uxbridge
Phone: (905) 852-9181ext. 215
Fax: (905) 852-9674
Email: [email protected]

Road Operations Manager: Bill Rynard, C. Tech
Public Works Depot
Phone: (905) 852-9087
Fax: (905) 852-1992
Email: [email protected]

Manager Recreation Facilities and Parks:  Bob Ferguson
Uxbridge Arena

Phone: (905) 852-3081
Fax: (905) 852-2946
Email: [email protected]

Administrative Assistant: Jo Ann Merrick
Township of Uxbridge
Phone: (905) 852-9181 ext. 202
Fax: (905) 852-9674
Email: [email protected]

Facility Booking Clerk:  Karen Ryl
Phone:  (905) 852-6761
Email:  [email protected]

Public Works Department Fees

ITEM CURRENT FEE
Design Criteria (CD Format)  
     Picked up at Municipal Office $25.00 plus HST
     Mailed $25.00 plus postage
Road Damage Deposit $100.00 per meter of Frontage
Entrance Permit $1,100.00 ($1,000.00 refunded after
entrance is finished and inspected
Filming Permit - Daily $500.00 plus applicable rental fees for municipal facilities or cost recovery for any municipal service
Filming Permit - 3 consecutive days $1,000.00 plus applicable rental fees for municipal facilities or cost recovery for any municipal service
Filming Permit - 4-7 consecutive days $1,750.00 plus applicable rental fees for municipal facilities or cost recovery for any municipal service
Filming Permit - over 7 consecutive days $2,500.00 plus applicable rental fees for municipal facilities or cost recovery for any municipal service
Filming Guide Permit Application Form
Municipal Consent $150.00
Encroachment Agreement Application $300.00

Entrance Permits 

Road Occupancy Permit

Road Occupancy Permit

Encroachments

The Director of Public Works and Operations considers to permit or not permit encroachments on public lands on an individual basis dependant upon the Applicant being able to prove that the need for the encroachment is reasonable, feasible and no alternative option exists.  In addition, the Applicant must prove to the Director of Public Works and Operations that the encroachment does not jeopardize the health and safety of the public, must be in the public's best interest and must be minor in nature.

Please review the Encroachment By-law prior to making application for an Encroachment Agreement.

A request for an Encroachment Agreement will only be accepted using the Encroachment Agreement Application Form

Online forms are available in PDF “Fill & Email” format.  “Fill & Email” PDF forms allow you to enter and save information directly from your computer and email the form with the information you entered.  PDF forms require Adobe Acrobat Reader to be installed on your computer. This software is free and available from the Adobe Website. 

POLICIES

POLICY
Adopt-A-Road Program

ALCOHOL POLICY
Township of Uxbridge Alcohol Policy

Downtown Uxbridge Flood Reduction  

Township of Uxbridge and Region of Durham
Downtown Uxbridge Flood Reduction
Schedule 'C' Municipal Class Environmental Assessment
Environmental Study Report 

ARTICLE PDF LINK
Downtown Uxbridge Flood Reduction
Environmental Study Report
Appendix A: Historical Newspaper Records of Flooding
Appendix B: LSRCA Flood Management Proposal

Appendix C:  Terms of Reference for Update to 1983 Flood Relief Study

Appendix D:  Steering Committee Meeting Reports
Appendix E: Culvert Condition Assessment Reports
Appendix F:  Uxbridge Brook Geomorphic and Aquatic Hatitat Assessment Report
Appendix G:  Phase 1 Environmental Site Assessment Report
Appendix H:  Phase 2 Environmental Site Assessment Report
Appendix I:  Parking Demand Study Report
Appendix J: Archaeological Assessment Report
Appendix K:  Soils Investigation Report
Appendix L: Conceptual Design Drawing of the Preferred Solution
Appendix M:  Stakeholder List
Appendix N:  Public Notices and Advertisements
Appendix O:  Project Correspondence
Appendix P: Project News Articles
Appendix Q:  BIA Presentation and Press Briefing
Appendix R: Public Information Centre Material

 Back to Top

Keywords: 
public works